Skip to main content
Process

Installation in Minutes, Not Hours.

Conventional welding requires surface prep, permits, fire watch, and cooling time.
Our system bolts on instantly.

Position Base

Place the non-weld base plate on the surface.

Torque Bolts

Tighten hydraulic anchors to specified torque settings.

Clamp Lines

Insert pipes or cables and secure the top clamp.

Contact Us
Watch Our Short video For installation.